Highland Road Viaduct

Queenstown, New Zealand2024Bridges & Structures

Steel crews erecting the Highland road viaduct frame

1.2 km

Viaduct length

3 mm

Max pier movement

A 1.2 km steel-composite viaduct across unstable slopes — launched span by span, hillside untouched.

The old alpine road slipped a little more every winter. Our viaduct lifts the highway clear of the failure plane on 14 piers socketed into bedrock — and because spans were launched from one abutment, not a single crane touched the fragile slope below.

Each 60-metre steel-composite span was assembled behind the abutment and winched forward over PTFE slide bearings. Survey prisms on every pier confirmed movements under 3 millimetres through all four seasons of the build.

Heavy plant and crane working on the viaduct approach
“Two winters since opening and the road has not moved a millimetre.”— Regional Transport Authority