Skip to content

River Span Bridge

Zurich, Switzerland2025Bridges & Structures

Steel cable-stayed river bridge engineered by Arqon

420 m

Main span length

14 mo

Design to opening

A 420-metre cable-stayed crossing on a single pylon — designed for flood surge and a 120-year service life.

The brief demanded a crossing that would survive the river at its worst: spring melt, debris impact and a 200-year flood event. Our answer was a single-plane cable-stayed deck on one sculptural pylon, keeping every foundation out of the main navigation channel.

Segments were cast on the north bank and launched across the water in 12-metre lifts. Stay cables were tensioned in pairs under continuous survey control, so the finished deck profile sits within 8 millimetres of the design line.

Steel crews erecting structural spans during construction
“The pylon is a landmark now. Drivers slow down just to look at it.”— City Engineer, Zurich

Keep exploring

Related projects

From the blog

Related blogs

Back to Projects